Solar panels
Monocrystalline and bifacial panels with efficiency above 22%, a 25–30 year product warranty and 10–12 years on rated power.
From certified equipment and ANRE-authorized installation, to the prosumer dossier, turnkey solar parks and maintenance — everything you need for a solar system that performs for years.
A certified portfolio, manufacturer-backed warranties and the top brands on the European market — every component ships with complete technical documentation.
Monocrystalline and bifacial panels with efficiency above 22%, a 25–30 year product warranty and 10–12 years on rated power.
String and hybrid inverters with smart monitoring, compatible with on-grid, hybrid and off-grid setups, with Wi-Fi/RS485 communication and mobile apps.
LiFePO₄ batteries with integrated BMS, over 6,000 life cycles, compatible with the major hybrid inverters on the market.
ANRE-authorized teams, any roof or ground configuration, from project to grid connection. We stay with you from the first consultation to commissioning and prosumer registration.
Produces solar energy and consumes it in real time; the surplus is injected into the grid and credited by the supplier (1:1 offsetting guaranteed by law until 31.12.2030). No batteries.
Combines PV production with a hybrid inverter and batteries. By day it produces and stores the surplus, at night it draws from the battery, and any remaining surplus is injected into the grid.
A system fully independent of the grid: panels, an off-grid inverter, high-capacity batteries and, optionally, a backup generator. Not grid-connected — no prosumer dossier needed.
| Criterion | On-grid | Hybrid | Off-grid |
|---|---|---|---|
| Batteries included | No | Yes | Yes (high capacity) |
| Works during an outage | No | Yes (backup) | Yes (permanent) |
| National grid required | Yes | Yes | No |
| Relative upfront cost | Lowest | Medium | Highest |
| Payback time (est.) | 4–6 years | 6–9 years | 8–12 years |
| Bill reduction | 70–90% | 85–100% | 100% (no bill) |
| Prosumer dossier | Required | Required | No (off-grid) |
Before choosing your solar system it is essential to know your building’s electrical installation type — single-phase or three-phase. You can check it on the consumer unit or your distributor contract, and it directly affects the power you can legally install.
A single-phase installation (230V, one phase) is typical of apartments and small-to-medium homes, while three-phase (400V, three phases) is found in large houses, new buildings and commercial or industrial spaces. ELECRO checks your installation type during the free consultation and recommends the optimal inverter configuration.
| Criterion | Single-phase | Three-phase |
|---|---|---|
| Voltage | 230V (1 phase) | 400V (3 phases) |
| Max. PV system power (ANRE) | ≤ 6–8 kWp typical | No practical limit |
| Typical for | Apartments, small–medium homes | Large homes, commercial, industrial |
| Inverter required | Single-phase | Three-phase |
| Distributor requirement | Systems ≤ 10 kW | Systems > 10 kW mandatory |
| Suited to EV / heat pump | Partial (low power) | Yes, recommended |
We install on any roof or ground configuration, with mounting structures tailored to each surface.
An end-to-end process, with timelines communicated at every stage.
We analyse your consumption, roof, panel orientation and electrical installation type.
A detailed technical configuration with simulated yields and an estimated payback time.
Our own technical team, ANRE-authorized, with civil liability insurance.
We handle all the required documentation, standard turnaround 24h.
Testing, configuration and training on the monitoring app.
We install, replace or upgrade inverters and batteries in existing systems — without replacing the whole system. Ideal for turning an on-grid system into a hybrid one or upgrading an underperforming one.
We work with every major inverter and battery brand on the Romanian market. We verify compatibility before ordering and give objective technical recommendations, without being tied to a single manufacturer.
We handle the prosumer dossier end to end, from the first signature to the final connection approval. Our standard documentation turnaround is 24 business hours from receiving the client’s documents.
We submit the dossier to the relevant distributor (DELGAZ, DEO, RE or other) and follow the process through to approval.
ID, proof of ownership, latest electricity bill, installation technical data.
Technical project, single-line diagram, equipment datasheets.
To DELGAZ, DEO, RE or the relevant local distributor.
We liaise with the distributor and keep the client informed in real time.
We support signing the contract with your chosen energy supplier.
A dirty or uninspected system can lose 20–30% of its yield per year. We offer preventive and corrective packages to keep production at the guaranteed optimal parameters.
Cleaning with demineralized water and specialized equipment, without risking surface damage or panel warranty loss. Robotic cleaning capacity: ~2 MW/day.
Have a business or agricultural project? ELECRO also designs and builds turnkey solar parks (EPC) for companies — commercial, industrial and utility-scale. Details on our business site.
No mock-ups — real, documented projects across different counties and different roof types.
A free, no-obligation consultation: we tell you which service fits you, the savings you make and how fast your investment pays back.